Back to Selected WorkLandscape & Public Realm

Yamai Devi Lake Development

Aundh, Satara

Project Overview

A lake and gram-park redevelopment that returns the water's edge to the town. The scheme threads a continuous promenade around the lake, anchoring it with a ritual ghat, a sculpted heritage wall, a fountain plaza and shaded pergola courts, then layers in swings, play areas and timber bridges so the whole family finds a reason to stay.

At a Glance

  • Continuous lakeside promenade with ghat and ritual space
  • Sculpture wall, fountain plaza and shaded pergola courts
  • Play areas, large swings and timber bridge crossings
Limited Availability — Q4 2026

Your Site Has a Story.
Let’s Design It.

Tell us about your site, brief and budget. We’ll review it and show you what’s possible before you commit to anything.